SEARCH RESULTS
Found 238 Results
Page 12 of 27

February 2020 – Power Operated Tools


In order to protect employees, OSHA requires power operated tools that are designed to accommodate guards shall be equipped with such guards while in use. This month our team reviewed safe practices when operating power tools as well as daily inspection procedures to ensure each tool is equipped with the proper guard and ready for…

February 12, 2020


Foster Farms Livingston Plant Expansion


Foster Farms Livingston Plant Expansion This project includes an addition and remodel to the existing Foster Farms Plant in Livingston. Tilt-up concrete construction.  CLIENT: ARCHITECT: LOCATION: YEAR: Foster Farms Justin W. Capp Engineering Livingston, CA January 2020 Related Projects  

January 28, 2020


January 2020 – Trench Safety


OSHA has made reducing trenching and excavation hazards the Agency’s Priority Goal. There has been an increase in trench and excavation related incidents lately. A cubic yard of soil can weigh as much as a small pickup truck and workers need to be protected from trench collapses and cave-ins. This month C.T. Brayton & Sons…

January 13, 2020


TUSD Pitman High School Culinary Arts


TUSD Pitman High School Culinary Arts This project included renovation of an existing faculty dining area into a culinary arts classroom. CLIENT: ARCHITECT: LOCATION: YEAR: Turlock Unified School District California Design West Turlock, CA 2020 Related Projects

January 2, 2020


Manteca High School Playfield


Manteca High School Playfield This project included renovation of an existing playfield. Hardscape, parking lot, and landscape were also new. CLIENT: ARCHITECT: LOCATION: YEAR: Manteca Unified School District Rainforth Grau Architects Manteca, CA 2019 Related Projects

December 27, 2019


December 2019 – Workplace Violence


C.T. Brayton & Sons has a zero-tolerance policy towards workplace violence. This month our team reviewed and discussed the workplace violence prevention program incorporated within the emergency action plan. Part of having a safe and secure worksite free of recognized hazards includes training employees on recognizing hazards and how to avoid or diffuse potentially violent…

December 16, 2019


TUSD Pitman High School Field


TUSD Pitman High School Field This project included demolition of existing football field and track with new construction of playfields and associated site work. CLIENT: ARCHITECT: LOCATION: YEAR: Turlock Unified School District California Design West Turlock, CA 2019 Related Projects  

November 28, 2019


November 2019 – Silica Dust Training


Respirable crystalline silica are very small particles at least 100 times smaller than ordinary sand. It’s commonly found on a job site when there is grinding, cutting, and drilling of construction materials such as concrete, mortar, brick, and block. Workers who inhale respirable silica are at increased risk of developing Silicosis, which is an incurable…

November 12, 2019


October 2019 – Ammonia Leak Drill


Working at a food processing facility brings a unique set of challenges and safety hazards. This month, during the construction of the Livingston Food Service Expansion building, C.T. Brayton & Sons helped Foster Farms conduct an ammonia leak drill. Ammonia is an extremely hazardous chemical and can be explosive. All employees on site were evacuated…

October 18, 2019


Page 12 of 27