Foster Farms – Water Recovery System
This project includes installing new equipment at the existing wastewater pond to filter the water to be used in non-potable applications. An approximated 1,400 feet underground pipeline from the pond to the plant was also installed, which connected to the rooftop in various areas of the plant.
CLIENT:
ARCHITECT:
LOCATION:
YEAR:
Foster Farms
Justin W. Capp Engineering + Design
Livingston, CA
2016