Rizo Lopez Foods – Cheese Processing Plant

The Rizo’s had acquired the Toyota TrimMaster plant Modesto and were moving their full cheese processing facility from multiple sites in Riverbank under one 130,000 square foot facility. Insulated Metal Panel Walls system and polyurethane flooring was applied.

CLIENT:
ARCHITECT:
LOCATION:
YEAR:

Rizo Lopez Foods
R. B. Welty & Associates, Inc.
Modesto, CA
2012

Related Projects